For over 35 years...

Case History

TRUST US, IT'S EASY
Case History

The prestigious collaborations, which began over twenty years ago with international organisations in Italy and abroad, continue today with the multi-year framework contracts for building maintenance and with the awarding of contracts to CERN, at the UN headquarters in Geneva, ILO in Turin and FAO and WFP in Rome. Important work also at Diplomatic Offices in Italy, such as the redevelopment of the building used as the Consulate of the Republic of Turkey in Milan.

Italy

Italy

Client:

GENERALI REAL ESTATE SGR

Year

2017-2018

Project

WORKLIFE INNOVATION HUB

Description

Casalecchio di Reno (BO) Regeneration of the whole complex of approximately 16,000 m2 and splitting up into several property units. The project involves the construction of three new production points for heat transfer fluids, a new air renewal system, as well as an adaptation of the existing thermal and fire prevention system.

Client:

PRESIDIO: REGINA MARGHERITA PAEDIATRIC HOSPITAL – TURIN

Year

2016-2017

Project

RESTRUCTURING AND REDEVELOPMENT OF PAEDIATRIC CARDIOLOGY AND CARDIOSURGERY DEPARTMENT

Description

Turin. Redevelopment of the entire hospital plan, including the executive design and construction of all the plant engineering parts serving the new department. On-site supply of medical equipment and instruments.

Client:

EMBASSY OF THE REPUBLIC OF TURKEY IN ITALY

Year

2015-2017

Project

CONSULATE GENERAL OF THE REPUBLIC OF TURKEY

Description

Milan. Total demolition and renovation of a historic building, construction of new concrete and steel structures, new external structural facade, lifts, internal architectural finishes (ceiling, walls, doors, painting) supply of furnishings suited to each specific interior design, remote control and supervision systems for all installations.

Client:

UNICREDIT BUSINESS INTEGRATED SOLUTIONS

Year

2015-2016

Project

CONSTRUCTING NEW MANAGEMENT HOUSING AND OFFICES

Description

Milan. Demolition and high-end construction, in Via Combi, of new internal structures and internal architectural finishes, supply of furniture and accessories suited to each specific interior design, security and alarm system, data communication, remote control and supervision system for all installations.

Client:

MAURIZIANO UMBERTO I HOSPITAL

Year

2014-2015

Project

INTENSIVE CARE AND INTENSIVE THERAPY DEPARTMENT

Description

Turin. Restructuring of the intensive and sub-intensive care unit, built with prefabricated building systems. Preparation of all technology systems and installation of hanging systems for the supply of electromedical equipment.

Client:

REAM SGR VIRGIN S.p.A.

Year

2014-2015

Project

RESTRUCTURING AND CHANGE OF USE OF AN ANCIENT LISTED BUILDING.

Description

Turin. Virgin Active Premium Fitness Centre construction, in addition to civil and plant work, significant structural work was carried out to construct a swimming pool inside the building. The installation work done (swimming pool water treatment, room air conditioning, sound diffusion, lighting systems), all under the Honeywell centralised supervision system, was considerable.

Client:

UNICREDIT SGR GENERALI

Year

2015

Project

RENOVATION OF OFFICE BUILDINGS

Description

Milan. Renovation of the office building in Viale Fulvio Testi. Construction works and installation of mechanical and electrical systems. Supply of furniture and accessories suited to each specific interior design, security and alarm system, data communication, remote control and supervision system for all systems.

Client:

CITTIGLIO HOSPITAL

Year

2014

Project

MOBILE OPERATING ROOM RENTAL

Description

Varese. Following renovation works of the existing operating block, a mobile unit with an operating block and an operating room in ISO 5 class was installed.

Client:

INTESA SAN PAOLO

Year

2012

Project

MUSEO DEL RISPARMIO

Description

Turin. Turnkey construction of technological systems and integrating them with audiovisual equipment for the new Museo del Risparmio.

Client:

MAURIZIANO UMBERTO I HOSPITAL

Year

2012

Project

HYBRID OPERATING ROOM

Description

Turin. Installation and fitting of a hybrid operating room complete with laminar airflow, radiant walls and angiograph mounted on a robot at the Mauriziano Umberto I Hospital in Turin. Installation of an integration system to control the equipment in the hybrid room, the ambient lights, music, audio/video data and related transmission. Environmental Classification Service. Restructuring work in the Offices/Spaces adjacent to the Hybrid Room.

Client:

DOLOMITI SPORT CLINIC

Year

2011

Project

ORTHOPAEDIC OPERATIONAL BLOCK AND STERILISATION UNIT

Description

Ortisei. Extension of the clinic with the construction of the new operating block, built entirely with prefabricated construction systems, with ISO 5 class operating rooms complete with sterilisation unit.

Client:

BANCA POPOLARE DI VICENZA

Year

2009

Project

GENERAL MANAGEMENT OFFICES OF THE BANCA POPOLARE DI VICENZA

Description

Milan. Restructuring of a building for fitting out the offices of the General Management of Banca Popolare di Vicenza. Listed building protected by the Superintendence of Fine Arts: execution of civil works, plant engineering, renovation and interior fittings.

Abroad

Abroad

Client:

CERN

Year

2018-2019

Project

SXA-5. CONSTRUCTING A NEW BUILDING FOR TEST OPERATIONS ON LHCB BEAM COMPONENTS

Description

France. Constructing a new building consisting of special foundations with CFA piling, CCA slab with a capacity of 20 tonnes/m2 on which the load-bearing structure in metal carpentry (500 tonnes) is supported. Enclosure composed of insulated metal complex and roof with Derbigum-type bituminous coating. The work is completed by two mezzanines for a total of 1300 m2, plasterboard partitions of 1000 m2 and two sanitary blocks.

Client:

LIBYAN MINISTRY OF HEALTH

Year

2019

Project

MOBILE UNITS WITH SURGERY SERVICE

Description

Libya Supply of two mobile units on wheels with surgical operating block. Completely autonomous with special systems and generator onboard. Equipped with all electromedical equipment.

Client:

LIBYAN MINISTRY OF HEALTH

Year

2019

Project

MOBILE EMERGENCY UNITS

Description

Libya Supply of two mobile units on wheels complete with all special systems, generator set and electro-medical equipment.

Client:

CERN

Year

2018-2019

Project

NEW EXISTING BUILDING SURVEY 287

Description

France. Demolishing existing roofing and raising it with a metal carpentry structure, “sandwich” type panelling and floors made with collaborating sheet metal and completion casting. Executive design and provision of all internal finishing works for construction of the offices and laboratories. Design and construction of the air conditioning and ventilation system and work on the sanitary water system.

Client:

CERN

Year

2018-2019

Project

RECONSTRUCTION BUILDING ENCLOSURE 156

Description

Switzerland. Asbestos remediation and demolition of facades and existing roof in order to completely reconstruct the enclosure including windows, polycarbonate panels and sandwiches.

Client:

VANGUARD – UNITED KINGDOM

Year

2017

Project

MODULAR UNIT WITH OPERATING ROOM

Description

London. Design and supply of 3 modular units with operating block and ISO 5 class operating room. Complete with all systems compliant with the regulations of the main European countries. Built to be installed in support and alongside hospital structures.

Client:

CERN

Year

2016-2017

Project

BUILDING EXTENSION 887 FOR ENH1 EXPERIMENT

Description

France. Excavation works, special foundations (bulkheads, tie rods, micropiles) for two pits for new neutrino detectors, CCA platforms with a capacity of 40 tonnes/m2, metal carpentry structure and insulated facade cladding with metal finish.

Client:

CERN

Year

2016-2017

Project

NEW BUILDING FOR 773 FOR IT-HUB

Description

France. New building construction for IT-HUB composed of excavation works, special foundations, structure in metal carpentry and external insulation coatings with metal finish. Internal fire partition structures.

Client:

VANGUARD – UNITED KINGDOM

Year

2015

Project

MODULAR UNIT FOR HOSPITAL

Description

London. Design and supply of modular unit with 8 hospital beds. Complete with all special systems for operating alongside hospital facilities.

Client:

CERN

Year

2015

Project

LHC CCC CONTROL ROOM

Description

France. Renovation of the entrance and exhibition space by carrying out demolition and structural reinforcement work, as well as interior and sanitary works.

Client:

CERN

Year

2014-2015

Project

CONSTRUCTION OF NEW BUNKER AND EXPERIMENT BUILDING CALLED 179-MEDICIS

Description

Switzerland. New building including underground bunker for activities with ionising radiation production, connected with existing building and built with earthmoving works and CCA works using magnetite (recipe developed by Dimensione in direct collaboration with CERN) and ordinary concrete. Insulation works above ground with a “coat” of plaster rock wool. Supply and installation of internal windows.

Client:

CERN

Year

2014-2015

Project

RENOVATION OF BUILDING ENCLOSURE 30

Description

France. Construction of a new ventilated facade with fibre cement panels and new windows in the stairwells and adjacent facades of building 30.

Client:

CERN

Year

2014

Project

NEW BUILDING 772 – BUNKER FOR RADIOACTIVE SOURCES

Description

France. New construction of office building and bunker for radioactive sources consisting of excavation works, special foundations, CCA structure and external insulation coatings with metal finish. Mezzanine structure in metal carpentry. Interior work including air conditioning and electrical systems.

Client:

CERN

Year

2013-2014

Project

RENOVATION OF THE ENTRANCE AND CONSTRUCTION OF THE GANGWAY AND INTERNAL WORKS FOR BUILDING 300

Description

Switzerland. Construction of a new entrance and internal pedestrian walkway in metal and glass for the exhibition route of the Synchrocyclotron, the first CERN accelerator.

Client:

ONU

Year

2013

Project

RECONSTRUCTION OF THE “VÉRRIERE” ENCLOSURE

Description

Switzerland. Demolition of the old structure and construction of the structure in metallic carpentry and glazed cladding for the external enclosure of the assembly hall of the UN in Geneva; glass roof with new explosion-proof glass.

Client:

CERN

Year

2011-2012

Project

DUMP

Description

France. Earthmoving works on the existing hill to reach the existing cave, creating an opening in the wall with controlled demolition and construction of a 15 m reinforced concrete tunnel for the new “Dump” of the beam for NA-62 experiments.

Client:

CERN

Year

2010

Project

CONSTRUCTION OF A NEW BUILDING

Description

Switzerland. Construction of a new extension to restaurant no. 1

Client:

SYRIAN MINISTRY OF HEALTH UNIVERSITY HOSPITAL OF DAMASCUS

Year

2009

Project

BONE MARROW TRANSPLANT CENTRE AND PAEDIATRIC CARDIO-SURGICAL OPERATING BLOCK

Description

Damascus. Design and construction of a new bone marrow transplant centre with an attached blood bank, at the university hospital of Damascus. Construction of a paediatric cardio-surgical operating block. Built with prefabricated wall systems and ISO 5 class operating rooms.